  • Client: BP Sunbury
  • Project: New Modular offices
  • Requirements: Full Mechanical & Electrical Installation
  • Contractor: Servaccomm

What we did

Following receipt of a prestigious order for 32,500ft of Office accommodation from BP Sunbury, servaccomm recognised that they required Mechanical and Electrical contractor who could provide a high quality service within a tight time frame and who could provide design and install the full M&E package.

N&P were able to respond quickly to this challenge and completed the project within a 28 week time frame; ahead of schedule.

This prestigous project was designed and installed to meet the latest government guidelines on conservation of fuel and power to include

  • LG3 lighting and occupancy sensing
  • Emergency lighting
  • Small power
  • Air conditioning and full vent heat recovery system to all areas
  • Server room with full UPS system and Close control system
  • 18KW PV system
  • Addressable fire alarm system
  • Full distribution system including the supply to the building